Saturday, August 23, 2008

1 Busy Saturday...

This morning i was scraping the other side of the french door out front and Mike was installing the balasters on the side porch. (pictures 1,2 &3) Then we decide to run to Lowe's to get the adhestive and grout for the back splash. (picture 4) We got most of it installed before dinner. Then after dinner Mike decided to install the flooring in the half bath since we didn't have enough painters tape so i could finish paint in there. (picture 5)
It was a very productive day.